100% of waste water to be reused

100% of waste water to be reused

A new wastewater station to be built in Algorós, Elche, will apply tertiary treatment to enable 100% of the water to be reused for irrigation. With a budget of €50 million, the project will make use of renewable energy with a 13,169 square metre solar farm. Full report in Costa Blanca News – in the

A new wastewater station to be built in Algorós, Elche, will apply tertiary treatment to enable 100% of the water to be reused for irrigation.

With a budget of €50 million, the project will make use of renewable energy with a 13,169 square metre solar farm.

Full report in Costa Blanca News – in the shops today (Thursday) for this week.

Read more in this week’s print edition or go to e-paper

Posts Carousel